Forest wide
Master Operation
1. Schema
master 2.Domain Naming master
Domain wide
master operation
3. PDC emulator
4. RID master
5. Infrastructure
master
Schema Master:
Responsible for
overall management of the entire schema in a forest.
The first DC
installed acts as a schema master in the entire forest.
There can be only
one schema master in the entire forest
Domain Naming Master:
Responsible for
addition /removal of domains.
It maintains the
uniqueness of domain names.
There can be only
one DNM in the entire forest.
3. PDC emulator:
PDC provides backward compatibility for
existing NT BDCs and workstations. (If it is running in mixed mode)
PDC updates the
password changes made by the users.
It is also
responsible for synchronizing the time.
There can be only
one PDC emulator per domain.
4. RID master:
Responsible for assigning unique IDs to the
objects created in the domain.
There can be only
one RID master per domain
SID – Security
Identifier it maintains a access control
list. It is divided into two parts.
1.
DID
(Domain Identifier)
2.
RID
(Relative Identifier)
For knowing the
SID of the user
>Start>run>cmd>
whoami /user
.
5. Infrastructure master:
Responsible for
maintaining the updates made to the user & group membership.
It also maintains
universal group membership.
There can be only
one infrastructure master per domain
The term
flexibility means we can transfer any of the 5 roles from DC to ADC.
No comments:
Post a Comment